MPP2-420

Improving completion progress of construction projects financed by Khanh Hoa Province

Basic capital investment takes a large part and plays an important role in development capital of the State Budget. However, as of the general situation in Vietnam, projects with basic capital investment from the budget of Khanh Hoa province are always behind the schedule. Thus, the objective of this research is constructing a model with factors influencing the progress of completing basic capital investment project from the budget of Khanh Hoa Province, then from that recommend solutions to improve, stabilize the progress of completing the project, and effectively utilize the basic capital investment.On the theoretical basis of the role of progress in the success of the project as well as factors influencing the progress of the project, the research has studied 165 projects in all types of construction, from national to provincial level. From the findings of the research, using the factors analysis method, 30 factors are divided into 8 groups of representatives. Through examining multivariate regression analysis model, it can be confirm that 7 out of 8 mentioned factors (excluding capital sources) have inverse relationship to the fluctuation of project’s progress, ranking from strong to weak influence accordingly: External Environment factors, Policies, Management System, Main Contractor’s Capability, Main Investor’s Capability, The Decentralized of Investor’s Authority, and the Consultant’s Capability, this theory is supported with 1% meaning. The strength of the 7 factor groups mentioned above on the fluctuation in project’s progress is influenced by the distinctive characteristic of the project: budget, this theory is supported with 5% and 10% meaning.With the above findings, the research has suggest recommendations to the Investors to have secondary plans to response to rapid changes of external environment as well as changes in policies; exercise serious, public bidding with selected capable contractors who are compatible to the scale, power, and complexity of the project; perfect the contents as well as monitoring mechanism, effective collaboration between implementing the contract and augmenting the leadership, project management ability of Investors. At the same time, the research suggest recommendations   to the State and local governments in order to stabilized the Basic capital investment environment, widely popularize the information management system, especially in planning, decentralize uniformly and comprehensively the authorities of Main Investors in project management as well as decentralize the investment capital of Basic capital investments in districts and commune level.
Type:
MPP Theses
Language:
Vietnamese
Date Published:
Jun 07, 2011
Pages:
0
Author:
Chau Ngo Anh Nhan

This site uses cookies to provide a better user experience.

Essential cookies are active by default and are necessary for the proper functioning of the website. Analytics cookies gather anonymous information for us to enhance and monitor the site. Performance cookies are employed by third parties to optimize their applications (such as videos and maps) that are embedded within our website. To accept all cookies, click 'I accept.'